top of page
100 THIRD STREET
Newburgh, NY
Project Type
Historic Renovation
Project Scope
This project consisted of the structural design for the renovation of a 1-story historic building.
Cuono Engineering designed and detailed the new low girder to replace the existing CMU bearing wall at the rear portion of the building, while verifying the structural capacity of the roof framing at the front portion, where the framing was spanning across the full width of the building. In addition, we verified the structural impact of the existing CMU walls to be relocated, as well as designed and detailed the rear steel plate retaining wall.
Project Team
Click on photos to view larger
bottom of page